04 November, 2012

Friday nights or we get a marginal amount if work done





Nate made an amazing fender out of a paper plate the other night it looks way professional i know DO NOT BE FOOLED


we had our monthly gang bbq so that mean Jimbrah came up and did some welding for me. My garelli tank supports broke so he welded em up since i am a terrible welder.


speaking of gang meetings this is how well eric was able to stand by the end of the night.

We then decided to burn an acoustic guitar i found on the street. it was terrible anyway. I ended up having to work this weekend since I had extra days off for Trick or Treat 2 so I might not get much else done this week. I did mange to score the Mear kit from treats for one one my v1 builds thats coming up.
Right now I have quite a few bikes ahead of me this winter;
 I  have my kickstart v1 with a dr 50cc aluminum kit that is going on my gadabout frame. That engine should be together by next month with a 16mm sha  and tomos homoet pipe. 
My pedal start v1 is going to get rebuilt with the mear kit and a bennesar pipe from my tomos back in the day. all that is going to be welded up to my Lady bee briton frame with tomos hydraulic forks and mags that i have. I just need to make an intake and use the 24mm mikuni ive all ready go sitting around. 
My Si is a long way off and needs a lot of machine work to be what its going to be. It is going to be worth the amount i need to do to it. that bike is way off.
My golden bullet Joemos just needs the hi comp head i have for it put on, a little jetting and lights if I want it to ride on the street. I want to try and get that done next weekend because that bike is a lot of fun to ride.
So pretty much I have four builds I need to get done this winter plus the other few bikes I have that run currently. With a little bit of luck I can get up to 8 running bikes at the same time. Time will tell. Stay tuned for more soon.





No comments:

Post a Comment